Research Careers Contact

GlossaryBill of materials

Bill of materials

A bill of materials (BOM) is the list of every part on a circuit board, with reference designators, quantities, manufacturer names, manufacturer part numbers (MPNs) and any approved alternates. It is what the buyer orders from and what the assembler builds to.

How it works

The BOM starts in the schematic. Every symbol carries fields for its value, footprint, manufacturer and MPN. The design tool groups identical parts into lines and exports them, usually as a spreadsheet or CSV. A typical line holds the quantity per board, the designators that use the part, a short description, the manufacturer and MPN, the footprint or package, and notes on alternates or special handling.

From there the BOM feeds two jobs. Purchasing checks each line against distributor stock, price, lead time and lifecycle status, then orders parts for the build quantity plus attrition. Assembly loads the lines into the machine program, matching each designator to a position in the pick-and-place file and each MPN to a reel or tray on the line.

A BOM scrub is the review step between design and purchasing. It finds missing or ambiguous MPNs, parts at end of life, parts out of stock, and mismatches between the BOM and the board files, and resolves them before money is spent.

BOM vs AML

The BOM lists what goes on the board. An approved manufacturer list (AML) lists which manufacturers and MPNs are allowed for each part. Many teams keep one primary MPN per line on the BOM and a set of approved alternates on the AML or in a column of the BOM. The buyer substitutes only from that approved set.

Why it matters

A missing line, a wrong MPN or an outdated alternate sends the buyer to the wrong part. The build is then held, reworked, or built with a part that does not fit the footprint or the circuit. A BOM that does not match the layout leaves the assembler asking questions, and every question adds time.

The BOM also drives cost and schedule. Parts usually make up a large share of an assembled board's cost, and a single part with a long lead time sets the date for the whole build.

How to get it right

  • Give every line a real MPN. A description such as "10k resistor" is not enough to buy. Include the manufacturer, the MPN, the quantity and every designator.
  • Say what can be substituted. List approved alternates. Mark lines that must not be substituted. Assemblers should not guess.
  • Mark parts that are not placed. List do-not-populate parts clearly so they are neither bought nor placed.
  • Keep it in step with the board. Export the BOM from the same revision as the board files, and check that designators match the placement file.
  • Check lifecycle and stock before release. A part that is end of life or out of stock is cheaper to replace in design than at the buyer's desk.

BOM in robotics and drone hardware

Robot and drone boards carry parts that are often scarce or specialized: motor drivers, current sensors, IMUs, high-current connectors and specific processors. A robotics controller BOM that still lists a regulator at end of life passes a visual review and fails when the buyer cannot get it. The replacement then has to be checked against the footprint, the voltage rating and the firmware before the build can run.

These teams also build in small batches and revise often, so the same BOM gets bought many times in small quantities. Keeping alternates approved and lifecycle checked on each revision prevents a recurring scramble for parts.

Learn more