Research Careers Contact

GlossaryEMC testing

EMC testing

EMC testing checks a product's electromagnetic compatibility: that it does not emit more electromagnetic noise than the rules allow, and that it keeps working when exposed to the noise and disturbances it will meet in use. The first half is emissions testing. The second half is immunity testing.

How it works

Emissions tests measure noise the product sends out. Radiated emissions are measured with antennas in a shielded or open test site, across a range of frequencies. Conducted emissions are measured on the power cables, using a line impedance stabilization network that presents a standard impedance. The results are compared with limits for the product's category.

Immunity tests expose the product to disturbances and check that it keeps working within defined performance criteria. Common tests include:

  • Electrostatic discharge, using an ESD gun on exposed surfaces and connectors, as defined in IEC 61000-4-2.
  • Radiated immunity, exposing the product to strong RF fields.
  • Electrical fast transients and surges on power and signal cables.
  • Conducted RF immunity injected on cables.
  • Power dips and interruptions for mains-powered products.

Which tests and limits apply depends on the product and the market. In the United States, FCC rules in 47 CFR Part 15 cover unintentional radiators, which includes most digital electronics. In the European Union, the EMC Directive sets essential requirements, usually met by testing to harmonized standards. Robots, industrial machines and medical devices fall under their own product standards, which set which basic tests apply and at what levels.

EMC testing vs EMI

EMI, electromagnetic interference, is the noise itself and the problems it causes. EMC is the property of a product that controls its emissions and resists interference. EMC testing is how that property is measured against the rules.

Why it matters

A product that fails required EMC testing cannot be sold in most markets until it is fixed, and fixes late in development often mean board respins, new cables or new enclosure parts. Beyond compliance, poor immunity shows up as real faults: a robot that resets when someone touches it, or a drone whose GPS loses lock when the motors spin up.

How to get it right

  • Design for EMC from the start. Solid ground planes, short return paths, filtered power inputs and controlled edge rates do more than late shielding.
  • Treat cables as antennas. Much of a product's emitted noise leaves on its cables. Filter signals and power where they leave the board, and use shielded cables bonded to the enclosure where needed.
  • Protect connectors. Add ESD and transient protection at every external connector.
  • Pre-scan early. Use near-field probes and pre-compliance tests on prototypes to find problems before formal testing.
  • Test the real configuration. Test with the cables, enclosures and loads the product ships with, and with motors and radios running.
  • Record performance criteria. Define what "keeps working" means for each immunity test before testing. A brief glitch that recovers on its own is often acceptable for one disturbance and not for another.
  • Keep the test unit fixed. Note the firmware version, cable set and configuration tested, since changing any of them changes the result.

EMC testing in robotics and drone hardware

Robots and drones combine high-current motor drivers, which switch fast and create strong noise, with sensitive sensors, radios and GPS receivers. Long motor cables and harnesses act as antennas. EMC problems in these products often come from motor drive switching coupling into cables, so layout of the power stage, filtering at the drive and cable routing are where most fixes happen.

Many robotics and drone teams run pre-compliance scans on each new board revision, since a change in power layout or a new cable can change emissions significantly.

Learn more