GlossaryProduct change notification
Product change notification
A product change notification, or PCN, is a formal notice from a component manufacturer that it is changing a product in a way that affects form, fit, function, quality or reliability. Examples include moving production to a new fab, changing die materials, modifying the package, or revising the datasheet.
How it works
Industry standard J-STD-046 sets how electronic component suppliers notify customers about product and process changes, including what counts as a change requiring notice, how much advance notice to give, and what information and qualification data to include. A related standard, J-STD-048, covers product discontinuance notices.
A PCN typically lists affected part numbers, describes the change, gives the reason, includes or references qualification data, and states the date after which shipped parts carry the change. Customers who need samples or have objections respond within a set window. Distributors and parts databases pass PCNs to customers who bought or track the part.
On the receiving side, engineering reviews each PCN against the designs that use the part: does the change affect performance in this circuit, soldering or assembly, reliability or compliance declarations? If the risk is real, the team tests samples, buys stock of the old version, or qualifies an alternate.
Product change notification vs end of life notice
A PCN announces that a part continues but changes. An end of life notice, or product discontinuance notice, announces that a part will stop being made, usually with a last-time buy date. Both trigger review, but an EOL notice forces a sourcing decision, while a PCN asks whether the changed part still works in your design.
Why it matters
A part that changes without review breaks qualified designs in subtle ways: a regulator with different stability margins, a sensor with a new noise profile, a package with a different solder profile. These changes show up as yield drops or field failures in builds made after the change date. Tracking PCNs connects supplier changes to the designs they affect.
How to get it right
- Subscribe to PCN notifications for every part on active BOMs, by manufacturer part number.
- Route each PCN to an owner who reviews it against the affected designs within the response window.
- Record decisions and keep evidence, such as test results on new samples.
- Update compliance data, such as RoHS and REACH declarations, when material changes.
- Watch first builds after a change date closely, at test and inspection.
Product change notifications in robotics and drone hardware
Robot and drone boards carry critical single-source parts, such as IMUs, motor drivers and processors, where a process change alters behavior the firmware and calibration depend on. A PCN on an IMU, for example, changes noise or offset, which affects flight performance. Reviewing PCNs is part of keeping a qualified design qualified.