Research Careers Contact

GlossaryKitting

Kitting

Kitting is the step where every part, board and material for a build is gathered, counted, labeled and grouped into one set before the job goes to the line. A complete kit means the line can start and finish the job without waiting for anything.

How it works

The kit list comes from the bill of materials and the build quantity, plus overage for parts lost in setup and pickup. Kitting staff pull reels, cut tape, trays and tubes from stock, check each against the manufacturer part number and approved alternates, count short strips and record lot and date codes. Bare boards, stencils and any special materials join the kit. Missing items are flagged as shortages before the job is scheduled.

Kits for automated lines are often prepared on feeder carts, so reels are loaded into feeders and checked against the placement program at the kitting step. Moisture-sensitive parts stay sealed, or their floor life is logged when bags are opened, as J-STD-033 describes.

Kitting vs consigned parts

In a turnkey build, the assembler buys parts and kits them. In a consigned build, the customer supplies some or all parts, and the assembler checks them in and kits them. Consigned kits often arrive with mixed packaging, unlabeled strips or short counts, so they need more checking before the build.

Why it matters

Many line stops in a small-lot build come from the kit: a missing part, a short count, a wrong value or a reel with no label. Each one stops the job or, worse, leads to a wrong part on the board. A careful kit also starts the traceability record, because it ties each lot to the build that used it.

How to get it right

  • Kit from the released BOM revision, never from an older copy.
  • Count and label short strips and loose parts, and record lot codes.
  • Include overage based on package type and feeder losses.
  • Flag shortages before scheduling the job, not at the machine.
  • Use barcode checks that match each reel to its BOM line.

Kitting in robotics and drone hardware

Robotics and drone builds often have long BOMs, small quantities and frequent revisions. A kit that matches the exact revision, with every alternate approved and every strip labeled, keeps a short build from stretching across days.

Learn more