Research Careers Contact

GlossaryHigh-mix low-volume

High-mix low-volume

High-mix low-volume (HMLV) is a manufacturing pattern in which many different board designs are built in relatively small lots, rather than one design running at high volume for a long time. Changeover, the switch from one job to the next, not run time, dominates the work.

How it works

On a high-volume line, setup happens rarely and the line runs one design for a long stretch. In HMLV, the next job is usually a different board. Each changeover means loading different parts into feeders on the pick-and-place machines, swapping the stencil, loading the placement and inspection programs, adjusting the oven profile, and running a first article before the lot. The actual placement of a small lot can take less time than the setup around it.

HMLV shops organize around that fact. They keep common parts loaded on feeders, prepare the next job's kit offline while the current one runs, build programs straight from CAD data, and test with methods that need no custom tooling, such as flying probe. Structured data formats like IPC-2581 and machine data standards like IPC-2591 (CFX) move each new design into production with less manual setup.

Changeover time is the time from the last good board of one job to the first good board of the next. Lean practice calls the method for cutting it single-minute exchange of die, or SMED: separate the setup steps that need the line stopped from those that can happen while it runs, move as many as possible to the second group, then shorten the rest. On an SMT line, that means loading feeder carts and staging the stencil offline, keeping programs ready and running the first article fast.

HMLV vs high-volume manufacturing

High-volume manufacturing spreads tooling, fixture and setup costs over many units, so a custom ICT fixture or a dedicated line makes sense. HMLV cannot spread those costs, so it favors flexible equipment, fast changeover and tooling-free test. Per-unit cost is higher in HMLV. The value is in getting many different designs built correctly and quickly.

Why it matters

Many hardware companies work this way: several boards per product, frequent revisions and lots in the tens to low thousands. A quote, a fixture or a line built only for high volume does not fit. The costs that matter are NRE, setup and lead time, not the per-unit price at large quantities.

HMLV also stresses the data. Every new job carries a new BOM, placement file and test plan. Missing or inconsistent files hurt more when they arrive every week instead of once a year.

How to get it right

  • Design for changeover. Standard fiducials, panel formats and a complete file package make each new job faster to set up.
  • Budget first article on every spin. HMLV does not mean skipping the first-article check. It means the first article happens often.
  • Share parts across boards. Fewer unique parts across a product family cut kitting work and part lead time.
  • Plan test without custom fixtures. Use flying probe, boundary scan and a reusable functional test harness where possible.
  • Choose partners built for it. A contract manufacturer organized for high volume treats small lots as interruptions.

HMLV in robotics and drone hardware

Take a robotics company that builds ten robot controllers, twenty actuator boards and a handful of sensor spins in a month, each on its own revision schedule, with a BOM that changes a few lines every spin. Drone companies run similar mixes of flight controllers, power boards and payload electronics. That is HMLV by definition. These teams need changeover speed, clean files and tooling-free test more than a single hard-tooled line, and they need each NPI step to move quickly because the next revision is already in design.

Learn more