Cycle time is how long it takes a station, machine or line to complete one unit, measured from the start of one unit to the start of the next. On an SMT line, it usually means the time between finished boards leaving the line once it is running steadily.

How it works

Each station has its own cycle time. The printer takes a certain time per print, each placement machine takes a time set by how many parts it places, and the oven moves boards at a set conveyor speed. The line's cycle time is set by its slowest station, the bottleneck. Measuring each station shows where that is. ISO 22400-2, which defines key performance indicators for manufacturing operations, defines related time measures used in factory software.

Line balancing spreads work across stations so each takes about the same time per unit. A station balance chart shows each station as a bar, and the tallest bar is the bottleneck. On an SMT line, the main balancing tool is the split of parts between pick-and-place machines: software assigns parts to machines and feeder slots so each finishes its share of the board in about the same time. The oven's conveyor speed sets a floor.

Cycle time vs takt time

Takt time is the available production time divided by the units customers need in that time. It is a target set by demand, not a property of the equipment. If a shift has 450 minutes available and customers need 150 boards, takt is 3 minutes per board. Cycle time is how long the line actually takes. When cycle time exceeds takt, the line falls behind. When it is far shorter, the line has spare capacity or builds stock ahead of need.

Lead time is different again: the span from order to delivery, including queues, kitting and shipping. A board can spend seconds in placement and still take weeks to deliver.

Why it matters

Cycle time sets output and drives cost per board, since every second of machine time has a price. An unbalanced line wastes the time of every station that waits on the bottleneck, and boards pile up in front of it. In a high-mix shop, the balance changes with every product, so takt is set per product family and changeover time counts against the time available.

How to get it right

  • Measure cycle time on the running line, not from machine ratings.
  • Measure each station so the bottleneck is clear.
  • Compare each station with takt, and recalculate takt when demand changes.
  • Rebalance placement for each product, moving slow odd-form parts to the machine with spare time.
  • Check whether the oven, test or inspection is the real limit before adding placement capacity.

Cycle time in robotics and drone hardware

For small lots of robot and drone boards, placement time per board matters less than changeover, programming and test time. A controller with hundreds of small passives and a few large connectors loads one placement head much more than another, so balancing or a separate step for large parts keeps the line moving. As programs grow from tens to hundreds of units, comparing test stations with takt shows which one becomes the limit first.

Learn more